Projects

Seismic Retrofit of Bank Saderat Iran-Industrial Br.

Seismic evaluation and retrofit studies of Bank Saderat Iran’s 4-stores building- Industrial Branch ...

Seismic Evaluation of Mehrabad Airport’s Car Park

Controlling and checking the structure’s implementation details, verification of the structure’s gravity and seismic resisting system, controlling the structural ductility and the serviceability regulations of Mehrabad Airport’s Multi-storey Car Park ...

St. Strengthening, Mehrabad Airport's Car Park

Strengthening studies of vulnerable points in the floors of -1 and -2 stores of Mehrabad Airport’s Multi-storey car park and presenting the strengthening plan by using FRP systems ...

Retrofitting of AryaSasol Petrochemical Buildings

Executing the structural retrofitting project of Arya Sasol Petrochemical Company’s administrative building including carbon fiber polymer composite (CFRP) installation in order to reinforce the floors concrete joists. ...

Retrofitting of Ladan Residential Tower

Executing the project of axial-bending strengthening of Ladan Residential Tower’s vulnerable columns by using the FRP strengthening systems ...

Grout Injection, Ferdos Commercial Complex

Pressure injection of non-shrink grout under the 120 Base plates attached to the foundation with dimensions of approximately 1000 × 1000 mm2, Tehran-Iran ...

Anchoring to Concrete, Mehr Shahr Complex

Design and execution of anchoring to concrete systems for connecting the new structural elements to the existing beams and columns, Karaj-Iran ...

Retrofiring of Floor Slab, Jamalzade Building

Design and execution of anchoring to concrete systems for strengthening and retrofitting of existing floor slabs, Tehran-Iran ...

Grout Injection, 7-Center Commercial Complex

Pressure injection of non-shrink grout under the 80 Base plates attached to the foundation with dimensions of approximately 800 × 800 mm2, Tehran-Iran ...

Grout Injection, Saeed Abad- Azadegan Bridge

Pressure injection of non-shrink grout under the Base plates attached to the top of 30 bridge columns of Saeed Abad Bridge, with dimensions of approximately 800 × 820 mm2, Tehran-Iran ...

Grout Injection, Parsian Commercial Complex

Pressure injection of non-shrink grout rear the Base plates attached to the central shaft with dimensions of approximately 1.2 × 2 m2, Tehran-Iran ...

Seismic Rehabilitation, Sirjan Power Plant Buildings

Seismic evaluation, Planning and designing concrete repair and seismic rehabilitation of Admin and Canteen buildings in Sirjan power plant, Sirjan-Iran ...

Seismic Rehabilitation, Hura Commercial Complex

Planning and designing of concrete repair and seismic evaluation and rehabilitation of Hura 9-storey concrete structure in Tehran-Iran ...

Retrofitting of Khomeini Shahr Gym Building

Vulnerability assessment and retrofitting of pool and sauna building in Khomeini Shahr gym, Eslamshahr-Iran ...

Seismic Ehabilitation of Saderat Bank Building

Seismic evaluation and rehabilitation of 2-storey masonry building, BSI, Monirieh Branch (Code 96), Tehran-Iran ...

Seismic Rehabilitation of Tajrish Garden-Tower

Seismic evaluation and rehabilitation of the 8-storey concrete structure to enhance a floor, Tehran-Iran ...

Seismic Rehabilitation of ZanjanTelecom Building-2

Seismic evaluation and seismic rehabilitation of the existing 5-storey concrete building in Zanjan Telecommunication Center (Hidaj Building), Zanjan-Iran ...

Seismic Rehabilitation of Zanjan Telecom Building-1

Seismic evaluation and seismic rehabilitation of the existing 5-storey concrete building in Zanjan telecommunication center (Setad Building), Zanjan-Iran ...

Seismic Rehabilitation of Mashhad Schools

Seismic evaluation and seismic rehabilitation of the over 15 schools in Mshhad-Iran ...

Seismic Rehabilitation of Tehran Schools Buildings

Seismic evaluation and seismic rehabilitation of the over 30 schools in areas 10, 11, 12, 13 in Tehran and Damavand-Iran ...